Solarfloatuk Case Study: Holiday Park de Krim
Project Snapshot
- Location:
- Holiday Park de Krim, Netherlands
- Installed Capacity:
- 785.4 kWp
- Annual Yield:
- 745.04 MWh (≈42% of on-site consumption)
System Highlights
- Concrete Floating Platforms:
- Low maintenance, 30+ year lifespan; no microplastics
- East West PV Layout with SolarEdge Optimisers:
- Module level monitoring; safe 1 V DC fault mode
- Dedicated Inverter House & AC Cabling:
- Behind the Meter Microgrid reduces grid dependence
Key Results
- Self Supply
- 42% of park’s electricity met on site
- Water Evaporation Reduction
- 30% less loss from water basin
- Local Grid Relief
- Lower peak demand; capacity freed for community use
- Operational Reliability
- Proven performance; real time data confirms targets
Benefits Realised
- Energy Security:
- Reliable, clean power without network upgrades.
- Cost Savings:
- Avoided grid reinforcement and water replenishment costs.
- Scalability:
- Battery integration ready for 24/7 green energy.